{"id":6618,"date":"2025-12-16T07:00:00","date_gmt":"2025-12-16T13:00:00","guid":{"rendered":"https:\/\/homerunresources.com\/?p=6618"},"modified":"2025-12-16T07:01:35","modified_gmt":"2025-12-16T13:01:35","slug":"homerun-resources-inc-announces-advancement-of-road-improvements-servicing-santa-maria-eterna-silica-and-solar-glass-hub","status":"publish","type":"post","link":"https:\/\/homerunresources.com\/pt\/homerun-resources-inc-announces-advancement-of-road-improvements-servicing-santa-maria-eterna-silica-and-solar-glass-hub\/","title":{"rendered":"HOMERUN RESOURCES INC. ANNOUNCES ADVANCEMENT OF ROAD IMPROVEMENTS SERVICING SANTA MARIA ETERNA SILICA AND SOLAR GLASS HUB"},"content":{"rendered":"<p><strong>Vancouver, BC: Homerun Resources Inc. (\u201cHomerun\u201d ou a \u201cEmpresa\u201d) (TSXV: HMR) (OTCQB: HMRFF) <\/strong>is pleased to announce that road improvement works benefiting the Company\u2019s planned silica processing and solar glass industrial hub in Santa Maria Eterna, in the Municipality of Belmonte, State of Bahia, Brazil, are firmly underway.<\/p>\n\n\n\n<p>The Santa Maria Eterna road project, connecting BA\u2011274 and BA\u2011982 and providing direct access to BR\u2011101, the principal federal highway in the region, is being funded primarily by the Federal Government of Brazil through the Ministry of Transport, via the Union budget, with the State of Bahia acting as the executing entity. Recent field photographs provided to the Company show grading, compaction, material placement and water\u2011truck operations along the Santa Maria Eterna corridor, confirming that road improvement activities have commenced on the segments that form the main logistics route to Homerun\u2019s Santa Maria Eterna silica project.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"456\" height=\"608\" src=\"https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.1.jpg\" alt=\"\" class=\"wp-image-6619\" srcset=\"https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.1.jpg 456w, https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.1-225x300.jpg 225w, https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.1-9x12.jpg 9w\" sizes=\"(max-width: 456px) 100vw, 456px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"455\" height=\"607\" src=\"https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.2.jpg\" alt=\"\" class=\"wp-image-6620\" srcset=\"https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.2.jpg 455w, https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.2-225x300.jpg 225w, https:\/\/homerunresources.com\/wp-content\/uploads\/2025\/12\/251215.2-9x12.jpg 9w\" sizes=\"(max-width: 455px) 100vw, 455px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p class=\"has-text-align-center\"><em>Figure 1 &amp; 2. Road construction underway along BA-982 SME District<br><br><\/em><\/p>\n\n\n\n<p><a>The 2026 draft federal budget (PLOA 2026) includes a specific road construction line item, \u201cBA<\/a>\u2011274 (Santa Maria Eterna) \u2013 Entr. BA\u2011275(A) (Itapebi)\u201d, under code 1C09 \u2013 Construction of road section, within the Ministry of Transport\u2019s investment program, with an allocated amount of R$15 million. This classification indicates that the initiative is financed predominantly with federal fiscal\u2011budget resources (\u201crecursos pr\u00f3prios\u201d of the federal treasury). While this BA\u2011274 \/ BA\u2011275 \u2013 Santa Maria Eterna item is not described in public documents as being exclusively or formally dedicated to Homerun\u2019s future solar glass plant, the route directly services the Santa Maria Eterna district and is highly supportive of the Company\u2019s long\u2011term industrial development plans.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><br><strong>EXECUTION OF INFRASTRUCTURE COMMITMENTS UNDER THE MOU<\/strong><\/p>\n\n\n\n<p>As disclosed on May 13<sup>th<\/sup>, 2025 (<a href=\"https:\/\/homerunresources.com\/pt\/homerun-resources-inc-signs-memorandum-of-understanding-for-land-donation-and-supply-of-infrastructure-services-for-the-development-of-the-companys-industrial-projects-in-bahia-brazil\/\">News here<\/a>), Homerun is party to a memorandum of understanding (\u201cMoU\u201d) with CBPM (Bahia\u2019s state geological service and mineral assets company), Bahia state government entities, the Municipality of Belmonte and Bahiag\u00e1s to advance the development of a silica processing plant and a large\u2011scale solar glass factory in Santa Maria Eterna. Local municipal decrees and coverage of this MoU reference obligations that include land for the industrial site, as well as commitments to improve infrastructure and logistics access to the district, which implicitly encompasses road access to BR\u2011101. This comes after Homerun\u2019s December 15<sup>th<\/sup> news release stating the Municipality of Belmonte\u2019s commitment and allocation of funding to the paving of approximately 5km of road connecting Santa Maria Eterna to BR-101, the main federal highway in the region.<\/p>\n\n\n\n<p>The commencement of construction on the BA\u2011274 \/ BA\u2011982 connection is an important early demonstration of this institutional support. The works now underway materially improve all\u2011weather access between Santa Maria Eterna and BR\u2011101, reduce future haulage risk and logistics costs for potential silica and solar glass operations, and visibly anchor the region\u2019s transition toward an industrial hub based on high\u2011purity silica and advanced glass manufacturing.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Sobre Homerun <\/strong>(<a href=\"https:\/\/homerunresources.com\/pt\/\">www.homerunresources.com<\/a> \/ <a href=\"http:\/\/www.homerunenergy.com\" target=\"_blank\" rel=\"noopener\">www.homerunenergy.com<\/a>)<\/p>\n\n\n\n<p>Homerun Resources Inc. (TSXV: HMR) is building the silica-powered backbone of the energy transition across four focused verticals: Silica, Solar, Energy Storage, and Energy Solutions. Anchored by a unique high-purity low-iron silica resource in Bahia, Brazil, Homerun transforms raw silica into essential products and technologies that accelerate clean power adoption and deliver durable shareholder value.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u2060Silica: Secure supply and processing of high-purity low-iron silica for mission\u2011critical applications, enabling premium solar glass and advanced energy materials.<\/li>\n\n\n\n<li>Solar: Development of Latin America\u2019s first dedicated 1,000 tonne per day high\u2011efficiency solar glass plant and the commercialization of antimony\u2011free solar glass designed for next\u2011generation photovoltaic performance.<\/li>\n\n\n\n<li>Energy Storage: Advancement of long\u2011duration, silica\u2011based thermal storage systems and related technologies to decarbonize industrial heat and unlock grid flexibility.<\/li>\n\n\n\n<li>\u2060Energy Solutions: AI\u2011enabled energy management, control systems, and turnkey electrification solutions that reduce costs and optimize renewable generation for commercial and industrial customers.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>With disciplined execution, strategic partnerships, and an unwavering commitment to best\u2011in\u2011class ESG practices, Homerun is focused on converting milestones into markets\u2014creating a scalable, vertically integrated platform for clean energy manufacturing in the Americas.<\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Em nome do Conselho de Administra\u00e7\u00e3o da<\/strong><\/p>\n\n\n\n<p><strong>Recursos Homerun Inc.<\/strong><\/p>\n\n\n\n<p><strong>&#8220;Brian Leeners&#8221;<\/strong><\/p>\n\n\n\n<p><strong>Brian Leeners, CEO e Diretor<\/strong><\/p>\n\n\n\n<p><strong>brianleeners@gmail.com \/ +1 604-862-4184 (WhatsApp)<br><br>Tyler Muir, Rela\u00e7\u00f5es com Investidores<br>info@homerunresources.com&nbsp; \/ +1 306-690-8886 (WhatsApp)<\/strong><\/p>\n\n\n\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-text-align-center\"><strong>PARA A ADEQUA\u00c7\u00c3O OU PRECIS\u00c3O DESTE LAN\u00c7AMENTO<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\"><em>As informa\u00e7\u00f5es aqui contidas cont\u00eam \u201cdeclara\u00e7\u00f5es prospectivas\u201d na acep\u00e7\u00e3o da legisla\u00e7\u00e3o de valores mobili\u00e1rios aplic\u00e1vel. As declara\u00e7\u00f5es prospectivas referem-se a informa\u00e7\u00f5es baseadas em suposi\u00e7\u00f5es da administra\u00e7\u00e3o, previs\u00f5es de resultados futuros e estimativas de valores ainda n\u00e3o determin\u00e1veis. Quaisquer declara\u00e7\u00f5es que expressem previs\u00f5es, expectativas, cren\u00e7as, planos, proje\u00e7\u00f5es, objetivos, suposi\u00e7\u00f5es ou eventos ou desempenho futuros n\u00e3o s\u00e3o declara\u00e7\u00f5es de fatos hist\u00f3ricos e podem ser \u201cdeclara\u00e7\u00f5es prospectivas\u201d.<\/em><\/p>\n\n\n\n<p class=\"has-text-align-center\"><strong>Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Vancouver, B.C.: Homerun Resources Inc. (\u201cHomerun\u201d or the \u201cCompany\u201d) (TSXV: HMR) (OTCQB: HMRFF) is pleased to announce that road improvement works benefiting the Company\u2019s planned silica processing and solar glass industrial hub in Santa Maria Eterna, in the Municipality of Belmonte, State of Bahia, Brazil, are firmly underway. The Santa Maria Eterna road project, connecting [&hellip;]<\/p>\n","protected":false},"author":1304,"featured_media":6619,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[14],"tags":[],"class_list":["post-6618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-release"],"_links":{"self":[{"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/posts\/6618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/users\/1304"}],"replies":[{"embeddable":true,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/comments?post=6618"}],"version-history":[{"count":1,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/posts\/6618\/revisions"}],"predecessor-version":[{"id":6621,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/posts\/6618\/revisions\/6621"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/media\/6619"}],"wp:attachment":[{"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/media?parent=6618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/categories?post=6618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/homerunresources.com\/pt\/wp-json\/wp\/v2\/tags?post=6618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}